1. Vehicle Cleaning
High-pressure water gun rinse
2.Vehicle Condition Inspection
- Inspect paint damage and communicate post-installation risks with the customer
- Record components requiring disassembly
3. Technician Tool Preparation
Prepare installation tools and mix installation solution
4. Pre-Installation Deep Cleaning
- Remove surface contaminants
- Clean gaps with a detailing brush
- Blow out debris from gaps with an air gun
- Use clay bar to eliminate paint surface particles
- Apply tar remover to clean asphalt and residual adhesives
5. Workshop Dust Control
Perform dust reduction treatment in the installation area
6. Vehicle Shielding
Shielding installation vehicles
7. Film Measurement & Cutting
- Measure panel dimensions with proper margins
- Precise cutting with a film cutter
- Remove all protective liners after unrolling the film
8. Final Pre-Installation Cleaning
- Clean paint with professional detailing clay
- Wipe surfaces and gaps with professional adhesive remover
- Clean paint with professional glass cleaner
- Rinse with tack solution
9. Surface Wetting
Apply ample installation solution to both paint and adhesive surfaces
10. Preliminary Trimming
Align film position and trim excess material to release tension
11. Positioning
- elect optimal anchor points
- Use specialized solution for alignment and initial squeegee work
12. Stretching
Perform full-surface stretching to accommodate curves, avoiding localized overstretching
13. Water Expulsion
- Squeegee from center to edges following body contours
- Pay special attention to body ridges
- Use tack solution in recessed areas, edges, and high-stretch zones
- The scrapers need to overlap during water expulsion
14. Precision Trimming
Trim excess film with precision knife, preserve wrapping margins, and flush edges
15. Edge Reinforcement
Inspect edges to ensure secure adhesion, clean alignment, and absence of bubbles/wrinkles
16. Post-Installation Quality Check
Verify installation quality and perform corrections if needed
17. Post-Installation Quality Check
Verify installation quality and perform corrections if needed
18. Completion
Remind owner to return for follow-up inspection after one week and provide maintenance instructions